in Antwerp Belgium sales price shop near me near me shop factory supplier LPG Cylinder Automatic Body Welding Line manufacturer best Cost Custom Cheap wholesaler

  in Antwerp Belgium  sales   price   shop   near me   near me shop   factory   supplier LPG Cylinder Automatic Body Welding Line manufacturer   best   Cost   Custom   Cheap   wholesaler

Hangzhou EPG Co.,Ltd. , was founded in November, 1997. With its 5 wholly owned subsidiaries. We can provide a entire-range of power transmission products like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks. We have exported our items to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the United states, Canada, and so on. I. Complete automatic welding line ( EPTTry list)

one EPTT trimming amp poEPTTng EPTT
two EPTT gap punching EPTT
three EPTT joggling EPTT
4 Autoamtic socket welding EPTT
five EPTT manage welding EPTT
6 EPTT base foundation welding EPTT
7 EPTTg welding EPTT
eight EPTT EPTTitudinal seam welding EPTT
nine Are plate slicing amp poEPTTng EPTT
10 EPTT head assembly and tag welding
eleven EPTT head circumferential seam welding EPTT

EPTT head circumferential seam welding EPTT:

EPTT EPTTitudinal seam welding EPTT

Handle/Base foundation welding line

II. EPTnical parameter:

A. EPTT trimming amp poEPTTng EPTT

This EPTT is used for upper/lower cap trimming, edge welding portion outer poEPTTng. The main shaft motor is five.5KW, the poEPTTng motor is one.5KW.

The EPTT uses four column EPT presser construction, PLC management, loading/unloading by mechanical arm, the cEPTTr mould rotation is EPTn by motor and EPT circumstance, the go over is EPTn by the top oil cylinEPTTto identify and press the workpiece, EPT system EPTs outer blade feeding, the outer blade follows by the interior blade dish on the primary shaft and cap workpiece to rotate and chopping. Facet has a poEPTTng EPTT, the poEPTTng dish will EPTTr to get rid of the dust on the higher cap welding spot, then rotation trimming and poEPTTng total at the identical time. The outer blade and poEPTTng dish reset, the principal oil cylinEPTTEPTn sliEPTTreset, and the help plaaet will increase the upper cap and flash in location.The unloading mechanical arm moves into the cEPTTr of the mould to take away the workpiecce to the center conveyor, then transfer to hole punching EPTT. The inner/outer blade utilizes high wear-resistant higher toughness die metal content, EPTT operating life, it can reuse following processing by the floor grinding EPTT,The internal/outer blade gap is 0mm, the distance in between the reducing into outer blade and internal blade is .2mm.

two set equipment has independent EPT station No.one and No.4, vane pump, 11KW. Each EPT station feeding the oil to two sets oil cylinders of the products, is EPT sliEPTTlifting and outer blade feeding reset, the EPTT operating stress established worth: outer blade 9 MPa, sliEPTT(include): 9MPa.

B. EPTT hole punching EPTT

This EPTT is used for higher cap hole punching.

The EPTT employs 4 column EPT presser construction, PLC management, loading/unloading by mechanical arm, the mechanical arm will give up soon after pushing the workpiece into the help pallet, the sliEPTTfalling down is EPTn by the leading oil cylinder, the cap EPTTrs into the reduced mould, the higher mould steady shifting down to complete the hole punching, the scrap EPT into the aggregate box by way of the reduce mould cEPTTr gap. The upper mould and sliEPTTdelay reset, rise the upper cap in spot, the unloading mechanical arm EPTTrs into the mould cEPTTr to get rid of the workpiece to the middle conveyor, then transfer to the socket welding and poEPTTng EPTT.

Equips with No.5 EPT station, one established, plunger pump. Location strain is 16MPa

C. Socket welding amp poEPTTng EPTT

This EPTT is employed for upper cap socket welding and edge welding part poEPTTng. Equip with Panasonic YD-350GL4 welEPTT1 set, drinking water cooling welding torch 1 pcs, 8L automated cycle water cooling tank 1 set. The main shaft motor is .75KW. PoEPTTng motor is 1.5KW, equip with the grating protection protection.

The EPTT utilizes 4 column EPT presser framework, loading/unloading by mechanical arm, front is socket welding, powering is interior poEPTTng, the cEPTTr mould rotation EPTs by the motor, adjust velocity by EPT transducer. Place the socket in the higher cap cEPTTr hole by manual, the top oil cylinEPTTEPTs the sliEPTTmoving down, clamp the workpiece, find and press at one particular time. After beginning the computerized working program, the mould workpiee rotates, the welding torch feeds in, and automatic arc welding. At the exact same time, the behind inner poEPTTng dish moves to outdoors, poEPTTng the higher cap edge welding part. The welding and poEPTTng finish at the identical time. After then, the oil cylinEPTTreset, workpiece rises in place, the unloading mechanical arm EPTTrs into the mould cEPTTr to eliminate the workpiece, and transfer to the take care of welding EPTT by means of middle conveyor.

Equip with NO. 6 EPT station, one set, vane pump, 5.5KW. Location strain: slipping 4 MPa, rising 9 MPa.

D. EPTT manage welding EPTT, 1 set

This EPTT is utilized for higher cap hadnle welding. Equip with 3 sets welding torch, three EPTs end at 1 time. Equip with Panasonic YD-350GL4 EPTs three sets, welding torch 3 pieces. Primary shaft motor is .4KW, with the grating security security.

The EPTT utilizes four column EPT presser composition, PLC manage, loading/unloading by mechanical arm, motor EPTs the workpiece rotation. Manually set the manage in the upper mould cEPTTr place which is mounted by the magnet, the loading mechanical arm give up after delivery the higher cap to the mould cEPTTr place, the oil cylinEPTTfalling EPTs the upper mould and handle push the higher cap in position, the computerized functioning program starts off, the cEPTTr mould workpiece rotates, a few welding torch feeding in at the identical time, automated arc welding. Soon after complete, the oil cylinEPTTresets, and workpiece rises in place, the unloading mechanical arm EPTTrs into the mould cEPTTr to clamp the higher cap and put on the center conveyor, then transfer to the assembly amp place welding EPTT.
Equip with No.seven EPT station, vane pump, 5.5KW. Placing force: pressing 4MPa, growing 9MPa.

E. EPTT joggling EPTT

The EPTT is employed for reduce cap trimming, joggling and outer poEPTTng. Main shaft five,5KW, poEPTTng motor 1.5KW.

The EPTT uses four column EPT presser composition, PLC control, loading/unloading by mechanical arm, motor EPTs the cEPTTr mould rotation, the top oil cylinEPTTEPT the deflectable upper presser clamp the workpiece, the EPT technique EPTs the outer blade feeding in, and do decrease cap rotating and joggling. Fter joggling, the outer blade reset, and major oil cylinEPTTEPTs the sliEPTTreset, the support pallet rises the reduced cap in location. The unloading mechanical arm EPTTrs into the mould cEPTTr to remove the workpiece to the center conveyor, then transfer to the bottom base welding EPTT. The internal/outer blade uses large wear-resistant large toughness die metal materials, EPTT working life.

Equip with No.two EPT station, vane pump, five.5KW. Driving the sliEPTTlifting and outer blade feeding and reset. The setting strain: doing work force 9MPa, outer blade 9MPa, sliEPTT(protect) 9MPa.

F. EPTT bottom foundation welding EPTT

This EPTT is used for lower cap bottom foundation welding, equip with a few welding torch, six EPTs could be finished at two occasions. Equip with Panasonic YD-350GL4 welEPTT3 sets, welding torch three piece. Main shaft motor .4KW, with the grating stability safety.

The EPTT employs four column EPT presser construction, PLC management, loading/unloading by mechanical arm, motor EPTs the workpiece rotation. Manually set the base foundation in the upper mould cEPTTr situation which is mounted by the magnet. The loading mechanical arm quits after sending the upper cap to the mould cEPTTr place. The oil cylinEPTTfalls down EPTs the upper mould and base foundation to push the upper cap in situation, the automatic doing work program begin, the cEPTTr mould workpiece rotates, 3 welding torch feeding in at the exact same time, computerized arc welding. Following welding, the oil cylinEPTTreset, the workpiece rises in location, the unloading mechanical arm EPTTrs into the mould cEPTTr to clamp the upper cap and set on the center conveyor.

Equip with No.three EPT station, vane pump, 5.5KW, location pressure: urgent 4MPa, increasing 10MPa.

G. Assembly and place welding EPTT

The EPTT is used for assembling the higher cap and decrease cap, vertical sort. Air cylinEPTTpress match equips with press head link rod, employed for the two 9kg and 14kg, change the relationship rod to switch. Manually place the reduce cap on the system, beside the situation, place the manage opener of the upper cap opposite to the bottom base welEPTTjoint, then assembly the upper cap into the reduced cap jogging component, open the guide management air valve, the earlier mentioned cylinEPTTpush the press head on the socket, automatic press the upper and decrease cap. Check out the lap joint, if necessary, use the wooden hammer to click on the lap joint to make it much more nearer, Following assembling, guide spot welding, about 2~3 EPTs for 1 circle. Soon after welding, manually push the cylinEPTTto the loading conveyor, the handle is in entrance and bottom foundation is in driving, the assembly and spot welding EPTT equips with SuperTIG-315 guide arc welEPTT1 established.

H. EPTT circumferential welding EPTT

The EPTT is utilized for circumferential welding of higher and lower cap, equip with welEPTTvision tracking method, finish the circumferential welding immediately, total automatic and no operator, every single set equips with Panasonic YD-500GS high velocity welEPTT1 set, drinking water cooling welding torch 1 piece, 8L circle cooling tank 1 piece. Equip with welEPTTvision monitoring program one established. The EPT control program utilizes EPT PLC control device, pro-confront color touch EPT operation EPT.

The EPTT employs horizontal double shafts construction, the major shaft and the base shaft is the exact same, air cylinEPTTEPTs the feeding, opposite relocating clamp is making use of for clamping or loosing the workpie. The major shaft EPTs by the velocity EPEPT, change speed by the EPT transducer, the primary shaft motor EPTT is .75KW. The major shaft and base shaft have independent welding mould, the welding torch situation can be altered aEPTT the cylinEPTTaxes course, there has fine tuning in the welding torch, precision fine tuning the welding torch placement. The EPTT head has welEPTTvision tracking method, X/Y shaft two dimension tracking EPTs the welding torch, X-shaft stepping motor 6N middotm, Y-shaft stepping motor 12N middotm. The EPTT head has exhaust pipe used for concentrating and exhaust the smoke. Equip with magnet mechanical arm unit, three doing work situation loading/unloading system, loading/unloading conveyor, unloading raceway.

Be aware: 1.) The arc place of circumferential welding must in the identical line with base base welEPTTjoint 2.) Ahead of switch off the circumferential welding EPTT, must change off the vision tracker initial, then turn off the circumferential equipment EPTT.

III. EPT working in customers’ EPTT

IV. Advantage

A. Reducing labour EPT – Our EPTTs can operate far more than fifteen many years, only 1 person for using treatment of 6 sets of circumferential welding EPTTs.

B. Decreasing electrical power – welding pace is only sixty seconds for one circle

C. Decreasing welding wires – (only 1 circle welding is needed).

D. EPTTer operation existence

E. Considerably less spatter – We compensated about two million for Patent of YD-500GS Panasonic welding EPTTs

V. Buyer reference record

one .TK Group in Bangladesh

two. HangEPT XiHu (West EPT) Dis.hu (West EPT) Dis. EPTshan Steel CylinEPTTEPTT,Ltd.http://, it is third most significant LPG gasoline cylinEPTTmanufacturer in EPTT, daily output is 18000pcs incXiHu (West EPT) Dis.Hu (West EPT) Dis. all sizes from 2kgs to 50kgs.

three. TPA is producing incredibly substantial good quality LPG cylinders for North America, European,British isles and Australia. http://, we provided automated welding line for their EPTT EPTT in HangEPT. Now we are building new LPG fuel cylinEPTTfactory in Vietnam, Hangphone, at the conclude of EPTTst , 2017, it will be set up and commissed.

4: ZheJiang EPTTnri Group co.,Ltd., http://en.huanrigroup.cn/products_record/pmcId=24.html, they are largest and strongest cylinEPTTmanufacturer in EPTT, they bougEPTT our EPTTs each for twelve.5 and15kgs manufacturing and 50kgs production.

five.AYGAZ in Turkey, .tr, previous week, they have presently purchased the complete welding line at us right after comparing with Noticed welding.

6. Manchester EPTTnk from United states of america

7. Sahuwala CylinEPTTin India

eight. EPT LPG Limited (SEACOM Team), they are placing up a new EPTT and we will just take liable for their twelve.5kgs and 33kgs manufacturing line.

  in Antwerp Belgium  sales   price   shop   near me   near me shop   factory   supplier LPG Cylinder Automatic Body Welding Line manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Antwerp Belgium  sales   price   shop   near me   near me shop   factory   supplier LPG Cylinder Automatic Body Welding Line manufacturer   best   Cost   Custom   Cheap   wholesaler