General Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this electrical power unit is designed for your operation of two independent circuits. Which are respectively for that most important and subordinate platforms from the double scissors lift. Two cut-off valves are used for lowering the machine manually in situation of energy reduction. If far more independent circuits are essential for your application please get hold of us for availability.
Remark: 1. Please consult our income engineer for the distinct pump displacement, motor power or tank capacity.
two. CSA or UL licensed motors are available on request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which might only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all the hydraulic elements concerned before installation of the electrical power unit.
3. Viscosity from the oil shoud be 15~46 cst,plus the oil must be clean and cost-free of impurities,N46 hydraulic oil is encouraged.
four. The electrical power unit should be mounted vertically.
5. Check the oil degree while in the tank immediately after the preliminary working in the electrical power unit.
6. Oil modifying is needed after the original one hundred operation hours,afterwards as soon as each 3000 hours.